Why Should You Localize?

Reverse engineering can readily facilitate the localization of spare parts manufacture, creating high-value jobs for Saudis and pave the road towards a knowledge-based economy

Link to Vision 2030

View a comprehensive report on localization’s link to Vision 2030 by our CTO, Dr. Hashim AlZain

We Bridge The Gap

DarTec complements ongoing efforts put in place to localize the manufacturing of parts and equipment by bridging the knowledge and skill gaps. DarTec bridges the market gaps between where the Kingdom is and where they aspire to be in terms of localization for parts and equipment by developing a comprehensive engineering package to enable local manufacturing by executing on the following:

Benefits of Working with Dartec 1/6
Conduct skill-gap-analysis to help bridge the gap between where the Kingdom’s industrial sector is currently at and where it aspires to be.
Benefits of Working with Dartec 2/6
Advise suitable Industry 4.0 technologies to create high-value jobs for Saudis & establish technology-based SMEs.
Benefits of Working with Dartec 3/6
Enable existing manufacturing facilities to maximize asset utilization.
Benefits of Working with Dartec 4/6
Advise on parts/equipment suitable for localization in various industries.
Benefits of Working with Dartec 5/6
Propose strategic investment opportunities to bridge the gap between market needs & supply.
Benefits of Working with Dartec 6/6
Conduct technical and commercial due diligence to de-risk industrial investments by developing engineering package and 1st article manufacturing.
Previous
Next

Advantages of Localization

Study the 5 main advantages that localization can bring to your corporation 

Comparison

between localizing and importing spare parts

Air Compressor Impeller
Imported
Imported
Localized
Localized
Air Compressor Impeller
Air Compressor Impeller

Long Lead-Time (90-Days)
Price/Unit (SR43,800/Part)

Long Lead-Time (90-Days)
Price/Unit (SR43,800/Part)

Reduce Lead-Time by 50-Days
Reduce Price by 16.55%

Reduce Lead-Time by 50-Days
Reduce Price by 16.55%

Boiler Burner Tip Nozzle
Imported
Localized
Boiler Burner Tip Nozzle
Boiler Burner Tip Nozzle

Long Lead-Time (90-Days)
Price/Unit (SR2,500/Part)

Reduce Lead-Time by 75-Days
Reduce Price by 13.46%

Boiler Igniter Automizer
Imported
Localized
Boiler Igniter Automizer
Boiler Igniter Automizer

Long Lead-Time (180 Days)
Price/Unit (SR4,500/Part)

Reduce Lead-Time by 145-Days
Reduce Price by 16.55%

Water Pump Impeller
Imported
Localized
Water Pump Impeller
Water Pump Impeller

Long Lead-Time (150 Days)
Price/Unit (SR47,500/Part)

Reduce Lead-Time by 60-Days
Reduce Price by 36.84%

previous arrowprevious arrow
next arrownext arrow
Air Compressor Impeller
Localized
Air Compressor Impeller

Reduce Lead-Time by 50-Days
Reduce Price by 16.55%

Imported
Localized
Air Compressor Impeller

Long Lead-Time (90-Days)
Price/Unit (SR43,800/Part)

Reduce Lead-Time by 50-Days
Reduce Price by 16.55%

Imported
Air Compressor Impeller

Long Lead-Time (90-Days)
Price/Unit (SR43,800/Part)

Boiler Burner Tip Nozzle
Localized
Boiler Burner Tip Nozzle

Reduce Lead-Time by 75-Days
Reduce Price by 13.46%

Imported
Boiler Burner Tip Nozzle

Long Lead-Time (90-Days)
Price/Unit (SR2,500/Part)

Boiler Igniter Automizer
Localized
Boiler Igniter Automizer

Reduce Lead-Time by 145-Days
Reduce Price by 16.55%

Imported
Boiler Igniter Automizer

Long Lead-Time (180 Days)
Price/Unit (SR4,500/Part)

Water Pump Impeller
Localized
Water Pump Impeller

Reduce Lead-Time by 60-Days
Reduce Price by 36.84%

Imported
Water Pump Impeller

Long Lead-Time (150 Days)
Price/Unit (SR47,500/Part)

previous arrowprevious arrow
next arrownext arrow
Air Compressor Impeller
Localized
Air Compressor Impeller

Reduce Lead-Time by 50-Days
Reduce Price by 16.55%

Localized
Imported
Air Compressor Impeller

Long Lead-Time (90-Days)
Price/Unit (SR43,800/Part)

Air Compressor Impeller

Reduce Lead-Time by 50-Days
Reduce Price by 16.55%

Imported
Air Compressor Impeller

Long Lead-Time (90-Days)
Price/Unit (SR43,800/Part)

Boiler Burner Tip Nozzle
Localized
Boiler Burner Tip Nozzle

Reduce Lead-Time by 75-Days
Reduce Price by 13.46%

Imported
Boiler Burner Tip Nozzle

Long Lead-Time (90-Days)
Price/Unit (SR2,500/Part)

Boiler Igniter Automizer
Localized
Boiler Igniter Automizer

Reduce Lead-Time by 145-Days
Reduce Price by 16.55%

Imported
Boiler Igniter Automizer

Long Lead-Time (180 Days)
Price/Unit (SR4,500/Part)

Water Pump Impeller
Localized
Water Pump Impeller

Reduce Lead-Time by 60-Days
Reduce Price by 36.84%

Imported
Water Pump Impeller

Long Lead-Time (150 Days)
Price/Unit (SR47,500/Part)

previous arrowprevious arrow
next arrownext arrow

Enhance Local Spending

DarTec can provide you with raw materials, manufacturing and state-of-the-art technologies, in Saudi Arabia.

Start Chat
1
Do you have a question?
Welcome to Dartec! How can I help you?
;